How to connect a power station to your house, safely
Never power the house by plugging a power station or generator into a wall outlet. CPSC calls this "backfeeding" extremely dangerous: it can electrocute utility workers and neighbors on the same transformer and it bypasses the home's circuit protection. There are two safe ways: run cords from the station to the appliances, or have a licensed electrician fit a power inlet and a transfer switch, so a 120/240 V station can run the circuits you choose.
Why a wall outlet is never the answer
A cord with a plug on both ends, pushed into a wall outlet, sends power backwards into the house wiring and out to the street. CPSC's generator safety alert calls this backfeeding "extremely dangerous": it is an electrocution risk to utility workers and to neighbors served by the same transformer, and it bypasses some of the home's built-in circuit protection. Wisconsin's consumer protection agency explains why: the transformer on the pole works in reverse and steps your 240 V up to line voltage. The same holds for a battery power station as for a gas generator.
Way 1: cords to the appliances
No wiring at all. Put the station where the appliances are and plug them in, or run cords to them. CPSC's advice for generators applies: heavy-duty cords, long enough, with no cuts and all three prongs. A battery station has no exhaust, so it can sit indoors next to the fridge or the bed (a CPAP); a gas generator must stay outdoors, 20 feet from windows and doors (Ready.gov). This is how most people use a 1 to 2 kWh station in an outage.
Way 2: an inlet and a transfer switch
For circuits that have no plug (a furnace fan, a well pump, hard-wired lights), an electrician fits:
- A power inlet on the outside wall or in the garage: the socket the station's cable plugs into.
- A transfer switch (or an interlock on the main panel) that disconnects the house from the grid before it connects the station. Wisconsin's guide recommends a double-pole, double-throw switch: it stops the station feeding the grid and stops the grid re-energizing the house wiring while the station runs, which protects the wiring and the station when power returns.
The guide's rule is the one to follow: have a licensed electrician install it. A permit is usually part of that; the electrician knows the local code.
Which stations can feed house circuits
A transfer switch for a home panel normally takes 120/240 V, because some circuits (a well pump, for one) run at 240 V. Four of the stations we cover put out 120/240 V:
| Spec | EcoFlow DELTA Pro 3 | Anker SOLIX F3800 Plus | Jackery Explorer 5000 Plus | Bluetti Apex 300 |
|---|---|---|---|---|
| Capacity | 4,096 Wh | 3,840 Wh | 5,040 Wh | 2,764.8 Wh |
| AC output | 4,000 W, 8,000 W surge | 6,000 W | 7,200 W, 14,400 W surge | 3,840 W |
| Battery | LiFePO4 (LFP), 4,000 cycles to 80% | LiFePO4 (LFP), 3,000 cycles to 80% | LiFePO4 (LFP), 4,000 cycles to 70% | LiFePO4 (LFP), 6,000 cycles to 80% |
| Weight | 113.5 lb | 136.7 lb | 134.5 lb | 83.8 lb |
| Wall recharge | up to 1,800 W input (no full-charge time stated) | up to 1,800 W input (no full-charge time stated) | up to 1,800 W input (no full-charge time stated) | up to 1,800 W input (no full-charge time stated) |
| Solar input | up to 2,600 W | up to 3,200 W, 1 h 30 min to full in ideal sun | up to 4,000 W | up to 2,400 W |
| Voltage | 120/240V split phase | 120/240V split phase | 120/240V split phase | 120/240V split phase |
| UPS switchover | 10 ms | 20 ms | 20 ms | 20 ms |
| Expansion | to 12,000 Wh | to 26,880 Wh | Not stated | to 19,354 Wh |
| Warranty | 5 years | 5 years | 5 years | 5 years |
| Price | $2,799 at Amazon, November 5, 2026 | Check the current price | Check the current price | Check the current price |
| Store | See at EcoFlow | See at Anker SOLIX | See at Jackery | See at Bluetti |